|
Year |
Unlinked Passenger Trips (Millions) |
Federal Funding (Millions) |
|
1997 |
7,954 |
$4,987 |
|
1998 |
8,115 |
$4,604 |
|
1999 |
8,523 |
$4,705 |
|
2000 |
8,720 |
$5,267 |
|
2001 |
9,008 |
$6,435 |
|
2002 |
9,017 |
$5,965 |
|
2003 |
8,876 |
$6,249 |
|
2004 |
8,937 |
$6,315 |
|
2005 |
9,175 |
$6,009 |
|
2006 |
9,379 |
$6,834 |
|
% Change |
17.9% |
37% |
|
Year |
Bus |
Commuter Rail |
Demand Response |
Heavy Rail |
Light Rail |
Vanpool |
Other Modes |
Total |
|
1997 |
1,606 |
230 |
350 |
540 |
40 |
40 |
48 |
2,853 |
|
1998 |
1,653 |
238 |
389 |
549 |
42 |
53 |
46 |
2,971 |
|
1999 |
1,719 |
243 |
418 |
561 |
47 |
60 |
62 |
3,111 |
|
2000 |
1,764 |
248 |
452 |
578 |
51 |
62 |
47 |
3,202 |
|
2001 |
1,821 |
253 |
490 |
591 |
53 |
66 |
45 |
3,319 |
|
2002 |
1,864 |
259 |
525 |
604 |
60 |
71 |
45 |
3,427 |
|
2003 |
1,881 |
262 |
544 |
612 |
64 |
72 |
41 |
3,476 |
|
2004 |
1,885 |
269 |
561 |
625 |
67 |
78 |
64 |
3,548 |
|
2005 |
1,885 |
277 |
589 |
629 |
68 |
94 |
60 |
3,602 |
|
2006 |
1,910 |
287 |
607 |
634 |
73 |
110 |
50 |
3,671 |
|
% Change |
18.9% |
25.0% |
73.4% |
17.4% |
83.4% |
175.8% |
2.2% |
28.6% |
|
Year |
Bus |
Commuter Rail |
Demand Response |
Heavy Rail |
Light Rail |
Vanpool |
Other Modes |
Total |
|
1997 |
4,602 |
357 |
60 |
2,429 |
259 |
9 |
237 |
7,954 |
|
1998 |
4,754 |
381 |
66 |
2,393 |
273 |
10 |
238 |
8,115 |
|
1999 |
4,992 |
396 |
69 |
2,521 |
289 |
12 |
245 |
8,523 |
|
2000 |
5,040 |
413 |
73 |
2,632 |
316 |
12 |
234 |
8,720 |
|
2001 |
5,215 |
418 |
77 |
2,728 |
334 |
12 |
224 |
9,008 |
|
2002 |
5,268 |
414 |
79 |
2,688 |
337 |
12 |
220 |
9,017 |
|
2003 |
5,147 |
410 |
82 |
2,667 |
338 |
13 |
220 |
8,876 |
|
2004 |
5,094 |
414 |
83 |
2,748 |
350 |
15 |
233 |
8,937 |
|
2005 |
5,226 |
423 |
87 |
2,808 |
381 |
17 |
234 |
9,175 |
|
2006 |
5,274 |
441 |
88 |
2,927 |
407 |
20 |
222 |
9,379 |
|
% Change |
14.1% |
23.1% |
57.8% |
38.1% |
52.6% |
181.9% |
-1.6% |
22.3% |
Mode |
1997 Vehicle Revenue Miles |
% |
2006 Vehicle Revenue Miles |
% |
|
Bus |
1,606 |
66.9% |
1,910 |
52.0% |
|
Commuter Rail |
230 |
10.1% |
287 |
7.8% |
|
Demand Response |
350 |
21.3% |
607 |
16.5% |
|
Heavy Rail |
540 |
22.2% |
634 |
17.3% |
|
Light Rail |
40 |
2.6% |
73 |
2.0% |
|
Vanpool |
40 |
3.9% |
110 |
3.0% |
|
Other |
48 |
1.7% |
50 |
1.3% |
|
Total |
2,853 |
|
3,671 |
|
|
Mode |
1997 Unlinked Passenger Trips |
% |
2006 Unlinked Passenger Trips |
% |
|
Bus |
4,602 |
57.9% |
5,274 |
56.2% |
|
Commuter Rail |
357 |
4.5% |
441 |
4.7% |
|
Demand Response |
60 |
0.8% |
88 |
0.9% |
|
Heavy Rail |
2,429 |
30.5% |
2,927 |
31.2% |
|
Light Rail |
259 |
3.3% |
407 |
4.3% |
|
Vanpool |
9 |
0.1% |
20 |
0.2% |
|
Other |
237 |
3.0% |
222 |
2.4% |
|
Total |
7,954 |
|
9,379 |
|
|
Item |
UZAs with Less than 200,000 Population |
UZAs Equal to or More than 200,000 and Less than 1 Million Population |
UZAs with More than 1 Million Population |
|
Uses of Capital — Non-Revenue Vehicle |
1% |
7% |
92% |
|
Passenger Fares |
2% |
5% |
93% |
|
Unlinked Trips |
3% |
7% |
90% |
|
Operating Expense |
3% |
9% |
87% |
|
Uses of Capital — Revenue Vehicle |
3% |
9% |
88% |
|
Vehicle Revenue Hours |
6% |
14% |
79% |
|
Vehicles Operated in Maximum Service |
8% |
15% |
77% |
Total Operating Expenses (Millions) 1997 — 2006 (Constant 2000 Dollars) |
|
|
Year |
Total Operating Expense (Millions) |
|
1997 |
$17,840 |
|
1998 |
$18,307 |
|
1999 |
$19,267 |
|
2000 |
$20,009 |
|
2001 |
$21,037 |
|
2002 |
$21,971 |
|
2003 |
$22,597 |
|
2004 |
$23,088 |
|
2005 |
$23,878 |
|
2006 |
$24,562 |
|
% Change |
37.7% |
Operating Expenses by Function and
|
||
|
|
Operating Expense (Actual Dollars) (Millions of Dollars) |
% |
|
Vehicle Operations |
$15,627 |
53.8% |
|
Vehicle Maintenance |
$5,724 |
19.7% |
|
Non-Vehicle Maintenance |
$2,994 |
10.3% |
|
General Administration |
$4,680 |
16.1% |
|
Total |
$29,024.6 |
|
|
Total Operating Expenses (Millions) by Mode 1997 – 2006 (Constant 2000
Dollars)
|
||||||||
|
Year |
Bus |
Commuter Rail |
Demand Response |
Heavy Rail |
Light Rail |
Vanpool |
Other Modes |
Total |
|
1997 |
$9,422 |
$2,275 |
$873 |
$3,474 |
$471 |
$23 |
$427 |
$17,840 |
|
1998 |
$9,713 |
$2,355 |
$995 |
$3,5330 |
$493 |
$28 |
$467 |
$18,307 |
|
1999 |
$10,146 |
$2,570 |
$1,097 |
$3,693 |
$536 |
$32 |
$505 |
$19,267 |
|
2000 |
$11,026 |
$2,679 |
$1,225 |
$3,931 |
$597 |
$32 |
$518 |
$20,009 |
|
2001 |
$11,813 |
$2,852 |
$1,410 |
$4,180 |
$676 |
$34 |
$562 |
$21,037 |
|
2002 |
$12,613 |
$2,995 |
$1,636 |
$4,267 |
$778 |
$39 |
$605 |
$21,971 |
|
2003 |
$13,316 |
$3,173 |
$1,779 |
$4,446 |
$815 |
$46 |
$611 |
$22,597 |
|
2004 |
$13,790 |
$3,436 |
$1,902 |
$4,734 |
$887 |
$57 |
$620 |
$23,088 |
|
2005 |
$14,666 |
$3,657 |
$2,071 |
$5,145 |
$978 |
$66 |
$655 |
$23,878 |
|
2006 |
$15,796 |
$3,765 |
$2,286 |
$5,287 |
$1,070 |
$77 |
$743 |
$24,562 |
|
% Change |
68% |
66% |
162% |
52% |
127% |
238% |
74% |
38% |
|
Object Class — Directly Operated Service 2006
|
||
|
|
Operating Expense (Actual Dollars) (Millions of Dollars) |
% |
|
Salaries |
$11,726 |
47.0% |
|
Fringe Benefits |
$7,795 |
31.3% |
|
Services |
$1,530 |
6.1% |
|
Materials and Supplies |
$3,097 |
12.4% |
|
Utilities |
$989 |
4.0% |
|
Other |
-$205 |
-0.8% |
|
Total — Directly Operated |
$24,932 |
|
|
Purchased Transportation (*) |
$4,093 |
|
|
Total |
$29,025 |
|
|
(*) Does not include purchased transportation detailed by object class. |
||
|
Year |
Bus |
Commuter Rail |
Demand Response |
Heavy Rail |
Light Rail |
Vanpool |
Other Modes |
|
1997 |
$2.2 |
$6.7 |
$10.4 |
$1.5 |
$1.9 |
$2.4 |
$1.8 |
|
1998 |
$2.1 |
$6.4 |
$15.7 |
$1.5 |
$1.9 |
$2.7 |
$2.0 |
|
1999 |
$2.1 |
$6.7 |
$16.5 |
$1.5 |
$1.9 |
$2.6 |
$2.1 |
|
2000 |
$2.2 |
$6.5 |
$16.7 |
$1.5 |
$1.9 |
$2.7 |
$2.2 |
|
2001 |
$2.2 |
$6.7 |
$18.4 |
$1.5 |
$2.0 |
$2.9 |
$2.5 |
|
2002 |
$2.3 |
$6.9 |
$19.9 |
$1.5 |
$2.2 |
$3.2 |
$2.8 |
|
2003 |
$2.4 |
$7.2 |
$20.3 |
$1.6 |
$2.3 |
$3.4 |
$2.8 |
|
2004 |
$2.5 |
$7.5 |
$20.8 |
$1.6 |
$2.3 |
$3.6 |
$2.7 |
|
2005 |
$2.5 |
$7.6 |
$20.9 |
$1.6 |
$2.3 |
$3.8 |
$2.8 |
|
2006 |
$2.5 |
$7.2 |
$21.9 |
$1.5 |
$2.2 |
$3.8 |
$2.8 |
|
% Change |
17.7% |
7.8% |
110.7% |
1.7% |
16.5% |
25.3% |
51.9% |
|
Year |
Bus |
Commuter Rail |
Demand Response |
Heavy Rail |
Light Rail |
Vanpool |
Other Modes |
|
1997 |
$79.5 |
$351.8 |
$38.6 |
$140.0 |
$190.7 |
$22.3 |
$89.2 |
|
1997 |
$78.8 |
$338.8 |
$39.1 |
$137.1 |
$188.5 |
$21.1 |
$102.6 |
|
1998 |
$71.3 |
$310.1 |
$34.2 |
$126.7 |
$172.8 |
$19.8 |
$90.7 |
|
1999 |
$79.8 |
$308.1 |
$40.0 |
$139.1 |
$177.6 |
$16.2 |
$112.9 |
|
2000 |
$80.9 |
$347.5 |
$40.6 |
$141.1 |
$187.9 |
$21.1 |
$127.6 |
|
2001 |
$82.7 |
$350.3 |
$43.8 |
$137.4 |
$191.4 |
$20.6 |
$123.4 |
|
2002 |
$84.0 |
$358.6 |
$44.4 |
$139.7 |
$188.6 |
$19.4 |
$128.5 |
|
2003 |
$84.6 |
$366.0 |
$44.4 |
$140.1 |
$187.1 |
$23.4 |
$74.2 |
|
2004 |
$86.5 |
$365.1 |
$45.3 |
$143.9 |
$187.9 |
$23.3 |
$109.9 |
|
2006 |
$88.2 |
$348.1 |
$46.5 |
$141.5 |
$182.8 |
$22.6 |
$131.8 |
|
% Change |
10.9% |
-1.1% |
20.5% |
1.1% |
-4.1% |
1.2% |
47.8% |
|
Year |
Bus |
Commuter Rail |
Demand Response |
Heavy Rail |
Light Rail |
Vanpool |
Other Modes |
|
1997 |
35.9 |
52.5 |
2.7 |
92.2 |
100 |
7.7 |
46.1 |
|
1998 |
36.0 |
52.6 |
1.5 |
88.3 |
99.2 |
6.5 |
49.4 |
|
1999 |
36.4 |
53.6 |
1.4 |
91.1 |
93.1 |
6.6 |
45.1 |
|
2000 |
35.5 |
47.5 |
1.4 |
92.1 |
93.1 |
4.9 |
49.9 |
|
2001 |
35.5 |
52.1 |
1.3 |
93.3 |
93.9 |
6.5 |
51.0 |
|
2002 |
35.1 |
50.7 |
1.2 |
89.1 |
85.1 |
5.6 |
45.8 |
|
2003 |
33.7 |
49.6 |
1.2 |
88.7 |
82.6 |
5.1 |
48.6 |
|
2004 |
33.5 |
48.5 |
1.1 |
88.6 |
80.3 |
6.1 |
29.7 |
|
2005 |
34.2 |
48.2 |
1.2 |
88.6 |
82.4 |
6.0 |
43.7 |
|
2006 |
33.8 |
48.2 |
1.1 |
91.6 |
81.1 |
6.1 |
45.5 |
|
% Change |
-6.0% |
-8.4% |
-58.5% |
-0.7% |
-19% |
-21% |
-1.3% |
Distribution of Fatalities 2006 |
||
|
|
Number of Fatalities |
% |
|
Passengers |
18 |
11.1% |
|
Revenue Facility Occupants |
2 |
1.2% |
|
Employees |
8 |
4.9% |
|
Other Workers |
1 |
0.6% |
|
Trespassers |
12 |
7.4% |
|
Other |
109 |
67.3% |
|
Suicides |
12 |
7.4% |
|
Total |
162 |
|
|
(*) Does not include Commuter Rail
|
|
|
ADA Lift– or Ramp– Equipped Buses Total 1997 - 2006 |
|||
|
Year |
Buses |
ADA-Lift or Ramp-Equipped |
ADA-Lift or Ramp-Equipped (%) |
|
1997 |
58,975 |
40,932 |
69.4% |
|
1998 |
60,830 |
46,278 |
76.1% |
|
1999 |
63,618 |
51,213 |
80.5% |
|
2000 |
65,324 |
54,585 |
83.6% |
|
2001 |
67,379 |
58,785 |
87.2% |
|
2002 |
68,418 |
64,407 |
91.4% |
|
2003 |
68,596 |
65,375 |
95.3% |
|
2004 |
68,789 |
67,454 |
98.1% |
|
2005 |
69,504 |
67,049 |
96.5% |
|
2006 |
70,227 |
68,880 |
98.1% |
|
Year |
Federal Operating Assistance |
Total Operating Funding (Millions) |
Federal Operating Assistance (*)(%) |
|
1997 |
$636 |
$18,859 |
3.4% |
|
1998 |
$772 |
$19,384 |
4.0% |
|
1999 |
$883 |
$20,548 |
4.3% |
|
2000 |
$984 |
$21,370 |
4.6% |
|
2001 |
$1,092 |
$22,464 |
4.9% |
|
2002 |
$1,249 |
$23,205 |
5.4% |
|
2003 |
$1,491 |
$23,709 |
6.3% |
|
2004 |
$1,838 |
$24,398 |
7.5% |
|
2005 |
$1,966 |
$25,214 |
7.8% |
|
2006 |
$2,135 |
$25,902 |
8.2% |
|
% Change |
235.9% |
37.3% |
|
|
|
“A” Type Buses |
“B” Type Buses |
||||
|
Year |
Buses |
ADA-Lift or Ramp-Equipped |
ADA-Lift or Ramp-Equipped (%) |
Buses |
ADA-Lift or Ramp-Equipped |
ADA-Lift or Ramp-Equipped (%) |
|
1997 |
45,502 |
29,684 |
65.2% |
5,136 |
4,143 |
80.7% |
|
1998 |
46,188 |
33,512 |
72.6% |
5,929 |
5,150 |
86.9% |
|
1999 |
46,891 |
36,029 |
76.8% |
6,613 |
5,959 |
90.1% |
|
2000 |
47,017 |
37,581 |
79.9% |
7,455 |
6,926 |
92.9% |
|
2001 |
47,925 |
40,501 |
84.5% |
7,830 |
7,337 |
93.7% |
|
2002 |
47,764 |
44,035 |
92.2% |
8,693 |
8,550 |
98.4% |
|
2003 |
46,608 |
43,780 |
93.9% |
9,346 |
9,127 |
97.7% |
|
2004 |
45,919 |
44,739 |
97.4% |
10,031 |
10,031 |
100.0% |
|
2005 |
45,524 |
43,479 |
95.5% |
10,631 |
10,499 |
98.8% |
|
2006 |
45,403 |
44,385 |
97.7% |
10,993 |
10,891 |
99.1% |
|
% Change |
-0.0% |
49.5% |
|
114.0% |
262.8% |
|
|
|
||||||
|
|
“C” Type Buses |
Articulated Buses |
||||
|
Year |
Buses |
ADA-Lift or Ramp-Equipped |
ADA-Lift or Ramp-Equipped (%) |
Buses |
ADA-Lift or Ramp-Equipped |
ADA-Lift or Ramp-Equipped (%) |
|
1997 |
6,853 |
6,194 |
90.4% |
1,484 |
911 |
61.4% |
|
1998 |
7,147 |
6,545 |
91.6% |
1,566 |
1,071 |
68.4% |
|
1999 |
8,265 |
7,722 |
93.4% |
1,849 |
1,503 |
81.3% |
|
2000 |
8,850 |
8,366 |
94.5% |
2,002 |
1,712 |
85.5% |
|
2001 |
9,622 |
9,176 |
95.4% |
2,002 |
1,771 |
88.5% |
|
2002 |
9,822 |
9,743 |
99.2% |
2,139 |
2,079 |
97.2% |
|
2003 |
10,084 |
10,002 |
99.2% |
2,558 |
2,466 |
96.4% |
|
2004 |
10,248 |
10,098 |
98.5% |
2,591 |
2,586 |
99.8% |
|
2005 |
11,118 |
10,846 |
97.6% |
2,231 |
2,225 |
99.7% |
|
2006 |
11,537 |
11,315 |
98.1% |
2,294 |
2,289 |
99.8% |
|
% Change |
68.3% |
82.7% |
|
54.6% |
151.3% |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Recovery Ratio 1997 — 2006 (Constant 2000 Dollars) |
|||
|
Year |
Fare Revenues (Millions) |
Total Operating Expense (Millions) |
Recovery Ratio (%) |
|
1997 |
$7,127 |
$17,931 |
39.7% |
|
1998 |
$7,277 |
$18,614 |
39.1% |
|
1999 |
$7,438 |
$20,030 |
37.1% |
|
2000 |
$7,772 |
$21,370 |
36.4% |
|
2001 |
$8,115 |
$22,989 |
35.3% |
|
2002 |
$8,149 |
$24,191 |
33.7% |
|
2003 |
$8,452 |
$25,376 |
33.3% |
|
2004 |
$9,086 |
$26,870 |
33.8% |
|
2005 |
$9,635 |
$28,761 |
33.5% |
|
2006 |
$10,353 |
$30,608 |
33.8% |
|
% Change |
45.3% |
70.7% |
|
|
Year |
UZAs Over 1 Million |
UZAs Equal to or More than 200,000 and Less than 1 Million Population |
UZAs Under 200,000 |
Total |
|
1997 |
$0.06 |
$0.16 |
$0.32 |
$0.08 |
|
1998 |
$0.07 |
$0.23 |
$0.40 |
$0.09 |
|
1999 |
$0.08 |
$0.28 |
$0.45 |
$0.10 |
|
2000 |
$0.08 |
$0.31 |
$0.52 |
$0.11 |
|
2001 |
$0.09 |
$0.32 |
$0.57 |
$0.12 |
|
2002 |
$0.11 |
$0.37 |
$0.61 |
$0.14 |
|
2003 |
$0.13 |
$0.45 |
$0.74 |
$0.18 |
|
2004 |
$0.17 |
$0.50 |
$0.79 |
$0.23 |
|
2005 |
$0.17 |
$0.52 |
$0.79 |
$0.24 |
|
2006 |
$0.19 |
$0.49 |
$0.87 |
$0.23 |
|
% Change |
201.4% |
200.1% |
172.3% |
200.6% |
Recovery Ratio by UZA 1997 - 2006 (Constant 2000 Dollars) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
UZAs with
More than 1 Million Population |
|||
|
Year |
Subsidy (Millions) |
Passengers (Millions) |
Subsidy per Passenger |
|
1997 |
$9,583 |
7,030 |
$1.36 |
|
1998 |
$9,931 |
7,173 |
$1.38 |
|
1999 |
$10,865 |
7,545 |
$1.44 |
|
2000 |
$11,400 |
7,718 |
$1.48 |
|
2001 |
$12,169 |
7,990 |
$1.52 |
|
2002 |
$13,202 |
8,140 |
$1.62 |
|
2003 |
$13,486 |
8,009 |
$1.68 |
|
2004 |
$13,789 |
8,085 |
$1.71 |
|
2005 |
$14,309 |
8,285 |
$1.73 |
|
2006 |
$14,546 |
8,446 |
$1.72 |
|
% Change |
51.8% |
20.1% |
26.3% |
|
UZAs Equal to or More than 200,000and Less than 1 Million Population |
|||
|
Year |
Subsidy (Millions) |
Passengers (Millions) |
Subsidy per Passenger |
|
1997 |
$1,288 |
684 |
$1.88 |
|
1998 |
$1,354 |
694 |
$1.95 |
|
1999 |
$1,490 |
723 |
$2.06 |
|
2000 |
$1,619 |
747 |
$2.17 |
|
2001 |
$1,713 |
748 |
$2.29 |
|
2002 |
$1,643 |
671 |
$2.45 |
|
2003 |
$1,751 |
657 |
$2.67 |
|
2004 |
$1,775 |
643 |
$2.76 |
|
2005 |
$1,822 |
666 |
$2.74 |
|
2006 |
$1,914 |
696 |
$2.75 |
|
% Change |
48.5% |
1.8% |
45.9% |
|
UZAs with Less than 200,000 Population |
|||
|
Year |
Subsidy (Millions) |
Passengers (Millions) |
Subsidy per Passenger |
|
1997 |
$492 |
240 |
$2.05 |
|
1998 |
$531 |
248 |
$2.14 |
|
1999 |
$564 |
256 |
$2.21 |
|
2000 |
$580 |
255 |
$2.28 |
|
2001 |
$653 |
270 |
$2.42 |
|
2002 |
$544 |
207 |
$2.63 |
|
2003 |
$575 |
211 |
$2.73 |
|
2004 |
$583 |
210 |
$2.78 |
|
2005 |
$636 |
224 |
$2.83 |
|
2006 |
$681 |
237 |
$2.88 |
|
% Change |
38.4% |
-1.3% |
40.2% |
|
UZAs with More than 1 Million Population |
||||||
|
Year |
Fare Revenues (Millions) |
Other (Millions) |
Federal Assistance (Millions) |
State Assistance (Millions) |
Local Assistance (Millions) |
Total (Millions) |
|
1997 |
$6,930 |
$2,537 |
$440 |
$3,317 |
$3,290 |
$16,513 |
|
1998 |
$6,983 |
$2,570 |
$514 |
$3,473 |
$3,372 |
$16,914 |
|
1999 |
$7,084 |
$3,551 |
$569 |
$3,422 |
$3,322 |
$17,949 |
|
2000 |
$7,205 |
$2,916 |
$619 |
$3,838 |
$4,027 |
$18,605 |
|
2001 |
$7,294 |
$2,672 |
$698 |
$4,392 |
$4,406 |
$19,463 |
|
2002 |
$7,275 |
$3,131 |
$873 |
$5,275 |
$3,923 |
$20,477 |
|
2003 |
$7,377 |
|||||